Make us your home page
Instagram

Tampa airport's shuttle trams arrive from Japan at Port Tampa Bay (w/video)

TAMPA — The trains arrived by boat and are headed to the airport.

Twelve train cars, which cost $1.9 million each, make up the SkyConnect people-mover shuttle system currently being built as part of the $1 billion phase one renovation at Tampa International Airport. The tram cars arrived at Port Tampa Bay from Mitsubishi's plant in Japan Monday morning aboard an auto liner ship.

The cars were rolled off the ship and will be installed at the airport by its manufacturer, Mitsubishi, this week. The people-mover shuttle system will connect a new rental car facility and the economy parking garage to the main terminal and will be operational early next year, eliminating the need for passengers to catch a bus.

Previous Coverage: Here's an updated look inside the $1 billion construction project at Tampa International Airport

"These trains represent the future of the Tampa International Airport, and continues on our legacy of innovation," said Joe Lopano, CEO of the Tampa airport, at an unveiling ceremony Monday. Gov. Rick Scott was among the many local, regional and state officials who attended. "We're writing the next chapter of the airport. And we're still growing. We are on par to have the most passengers this year in our history," Lopano added.

The first phase one of the airport's master plan renovation, which has been three years in the making, is coming to a close with the arrival of the SkyConnect train cars this year. It was the first major renovation to the airport since the terminal was built in 1971. The improvements — which include adding a slew of new retailers and restaurants to the terminals, building a new rental car facility that's double in size and adding the new shuttle system — will help the airport accommodate 35 million passengers a year, or double the annual amount recorded in 2013. The project has been slightly delayed through the year, but remains under budget. TIA issued bonds, used passenger facility fee collections and $194 million from Florida Department of Transportation to finance the project.

Earlier this year the airport came under fire by state legislators for its spending on the renovation. The airport is currently undergoing an audit related to the project.

Airport officials asked the public to vote on a name for the new people-mover system, which is how the moniker "SkyConnect" was chosen. The trams feature images of native Florida birds.

Previous Coverage: Tampa International Airport morphing into a mini-city unto itself

The people-mover train will also be the connector from the main terminal to the Gateway development area, the centerpiece of the $543 million phase two of Tampa International Airport's master plan, a 17-acre commercial development which includes plans for up to two hotels, an eight-story, 240,000-square-foot office building, a 20,000-square-foot retail strip and a gas station with a convenience store.

Contact Justine Griffin at jgriffin@tampabay.com or (727) 893-8467. Follow @SunBizGriffin.

SkyConnect By The Numbers:

1.4-miles : length of people mover track

12 cars: Number of tram cars that will be used in two-car configurations

2.7 million: (estimated) number of car trips taken off airport roads due to shuttle service

$1.9 million: Cost per tram car

$417 million: Cost for entire people mover system, including stations.

6,900: Construction workers to build the people mover track and stations.

3.4 million: Hours worked during construction period

28 million: Pounds of steel poured to create the people-mover track and rental car facility

50 miles per hour: Maximum train speed

56 passengers: Capacity per car

2,500 passengers: Total number of people a car can move per hour per direction.

5 minutes: Trip length from rental car center to main terminal, including a stop at the economy parking garage.

Six birds: Featured birds on trams include a black skimmer, great egret, roseate spoonbill, white ibis, white pelican and a bald eagle.

13 months: Time to build and test the trams.

10,190 miles: Distance the cars traveled from Japan to Port Tampa Bay.

Tampa airport's shuttle trams arrive from Japan at Port Tampa Bay (w/video) 07/17/17 [Last modified: Tuesday, July 18, 2017 12:36am]
Photo reprints | Article reprints

© 2017 Tampa Bay Times

    

Join the discussion: Click to view comments, add yours

Loading...
  1. Allegiant Air strands 200 in Las Vegas, possibly for days

    Airlines

    What happened in Vegas will stay in Vegas — at least until Thursday for about 200 Allegiant Air passengers who were stranded Sunday when their flight to Oklahoma City was canceled.

    About 200 Allegiant Air passengers are stranded in Las Vegas, perhaps for days. Allegiant's headquarters, shown here, is located in the Las Vegas suburb of Summerlin, Nevada.
[JAMES BORCHUCK   |   Times]


  2. Cott Corp. sells beverage manufacturing business for $1.25 billion

    Business

    TAMPA — Cott Corp., a beverage manufacturer with headquarters in Tampa and Toronto, announced Tuesday it is selling its national beverage manufacturing business to Refresco for $1.25 billion.

    Cott Corp CEO Jerry Fowden
[Handout photo]
  3. Duke Energy Florida again ranks last in J.D. Power satisfaction survey

    Business

    ST. PETERSBURG — Another J.D. Power customer satisfaction survey, another last place annual ranking for Duke Energy Florida.

    Duke Energy Florida president. Can he improve the utility's customer satisfaction ratings?
[SCOTT KEELER   |   Times file photo]
  4. Trigaux: Florida's jobless rate looks great — but 25 other state rates look even better

    Economic Development

    No debate here: Florida's unemployment rate continues to drop — even as more people move to Florida and enter the workforce. What's not to like?

    Who remembers the remarkable lines of hundreds of people looking for construction work in Tampa back in March of 2010 at a job fair at the Encore construction site near downtown Tampa? Now the construction industry is struggling to find skilled workers to meet building demand. [
JOHN PENDYGRAFT | TIMES]
  5. Last orca calf born in captivity at a SeaWorld park dies

    Tourism

    ORLANDO — The last killer whale born in captivity under SeaWorld's former orca-breeding program died Monday at the company's San Antonio, Texas, park, SeaWorld said.

    Thet orca Takara helps guide her newborn, Kyara, to the water's surface at SeaWorld San Antonio in San Antonio, Texas, in April. Kyara was the final killer whale born under SeaWorld's former orca-breeding program. The Orlando-based company says 3-month-old Kyara died Monday. [Chris Gotshall/SeaWorld Parks & Entertainment via AP]